Calculate cut and fill quantities from surveyed or designed cross-section areas and station chainages using the average end-area method. Enter project-specific bulking and shrinkage factors; FRELUX does not infer them from soil type. Any cut-to-fill balance is shown only after an engineer confirms material suitability.
Enter each station's chainage, cut area and fill area. Results include bank cut, compacted fill, loose haul and bank-equivalent fill quantities. This is a quantity estimate, not a survey or geotechnical design.